Welcome to ULMA´s web site

 
Link to ULMA home page

Our Projects

Building projects completed using this product: BIRA Circular Formwork
    

List of Works

 
New Floodgate, Seville, Spain

New Floodgate, Seville, Spain

Optimal application of large volumes of formwork for a short execution period

 

 

The floodgate separates the water level downriver, which varies with the tides, the periods of rain and the ebb tide, from the water level upriver, in the marina, which has a constant depth and is not subject to tides.

See detail

 

 

AP1 Eibar-Vitoria Highway, Basagoiti Viaduct, Spain

AP1 Eibar-Vitoria Highway, Basagoiti Viaduct, Spain

Effective engineering with high performance, safety and low cost

 

 

ULMA Construcción has contributed to the infrastructure improvement in the Basque Country through the construction of the Eskoriatza North-Arrasate North stretch, which is part of the Eibar-Vitoria Highway. Several projects have been completed within this stretch, such as the Izurieta-Apotzaga tunnel covering 260 meters, which opens out onto the Basagoiti viaduct, of 427 meters, designed to save the existing river bed. Additionally, there are two overpasses that allow overcoming the complex orography.

See detail

 

 

OLIMP IV Shopping Mall, Lublin, Poland

OLIMP IV Shopping Mall, Lublin, Poland

Construction profitability with versatile products

 

 

The largest shopping mall in the province of Lublin, with a total surface area of 126,000 m2, it consists of two large hypermarkets and 70 shops, as well as a roof and a multi-level parking garage of 18,500 m2.

See detail

 

 

Diversion and underground works on the M-111 road

Diversion and underground works on the M-111 road

MADRID, Spain

 

 

This project deals with the access to the Control Tower in the extension of Barajas Airport, Madrid.

See detail

 

1 2
 
 
 

Other options

 

© 2010 ULMA Construcción

ULMA Worldwide